Herve

For developers, neoclouds and inference providers

Powered land in Europe, grid connection in place.

Sites with spare grid capacity, checked with the owner before you see them.

High-voltage switchgear in an outdoor substation

Matched to your block size and your date.

Tell us your minimum block, the date you need power and your regions. Site details are shared under NDA.

Have a site with spare capacity, or need power for GPUs?