Herve

The bottleneck is power.

Every AI model runs on electricity. Getting it is now the slowest step.

Who we work with.

Owners have power. Developers need it. We check the site before either side spends time on it.

Aerial view of a biogas plant with four digester tanks

Site owners

You have a grid connection you do not fully use.

Battery parks, CHP and biogas plants, solar and wind with storage, industrial sites.

For site owners
High-voltage switchgear in an outdoor substation

Developers and neoclouds

You need powered sites for GPUs.

Data centre developers, neoclouds and inference providers.

For developers and neoclouds

Finding the right sites.

Our world model holds Europe's regulation, grid topology, fibre routes and plant registers.

We use it to find sites and pre-study whether each one can host GPUs.

Germany: high-voltage grid and CHP and battery sitesMap of Germany with the 380 kV grid and the CHP and battery sites of 1 MW or more in the MaStR register, summed per cell of about 25 km, cells of 10 MW or more.HamburgBerlinCologneFrankfurtMunich
Germany: CHP and battery units from the public register, with the high-voltage grid. Our sites are confidential and not shown.

Have a site with spare capacity, or need power for GPUs?